CNC Machined Part Water Pump, Oil Pump Flange Processing

Product Details
Customization: Available
Warranty: 1 Year
Type: Cold Stamping
Still deciding? Get samples of US$ 8/Piece
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
91
Year of Establishment
2009-09-02
  • CNC Machined Part Water Pump, Oil Pump Flange Processing
  • CNC Machined Part Water Pump, Oil Pump Flange Processing
  • CNC Machined Part Water Pump, Oil Pump Flange Processing
Find Similar Products
  • Overview
  • Product Description
  • Company Profile
  • Our equipment
  • Quality inspection
  • Certifications
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Material
Stainless Steel
Mould
Simple Single Process Dies
Surface Processing
Polishing
Fine Blanking
Open
Process
Forming Process
Industry
Metal Stamping Parts
Tolerances
0.1mm
Customized
Customized
Transport Package
Carton
Specification
customized size
Trademark
Hebei Nanfeng Metal
Origin
Hebei Cangzhou
HS Code
7106101900
Production Capacity
50000 Pieces/Year

Product Description

Product Description

CNC Machined Part Water Pump, Oil Pump Flange ProcessingCNC Machined Part Water Pump, Oil Pump Flange ProcessingCNC Machined Part Water Pump, Oil Pump Flange Processing
 

Company Profile

Hebei Nanfeng Metal Products Co.,Ltd is a private enterprise specialized in the research & development and production of metal products. It is located in Nanpi County, Hebei, which is always famous as "Electronic and Hardware hometown of China". Its west is next to Beijing-Shanghai high-speed railway and Beijing-Shanghai Expressway, and east is next to Huanghua Port, north is near to BeiJing and TianJin, south is borded on Shangdong province, with convenient transportation and superior environment.
It was formerly known as Heibei Nanfeng Group, which has been engaged in the metal product industry for over 30 years. The company is currently a large scale of stamping production enterprise with 200 million fixed asset, land of 150 mu, more than 300 employees.
CNC Machined Part Water Pump, Oil Pump Flange ProcessingCNC Machined Part Water Pump, Oil Pump Flange Processing

Our equipment


CNC Machined Part Water Pump, Oil Pump Flange Processing

Quality inspection

CNC Machined Part Water Pump, Oil Pump Flange Processing

Certifications

CNC Machined Part Water Pump, Oil Pump Flange Processing
CNC Machined Part Water Pump, Oil Pump Flange Processing

 

Packaging & Shipping

CNC Machined Part Water Pump, Oil Pump Flange Processing

 
 

FAQ

Q: Are you trading company or manufacturer ?

A: We are a customized factory.

Q: How long is your delivery time?

A: Generally it is 15-20 days for samples and 25-30 days for mass production, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: How do you ship the goods?

A: We have our cooperation forwarder, they can deliver the goods to you in very short time with competitive price, and you can ship by your own agent as your convenience.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. 

     Payment>=1000USD, 30% T/T + 50% Mold Fees in advance, balance before shippment.
B: FOB Tianjin/Beijing. Or EXW, CIF, DUU, ETC

Q1. Are you factory or trading company? 

A: We are a customized factory.

Q2.Can you provide sample for us? 
A: Yes, free sample is available

Q3. What raw material do you use? 
A: stainless steel, carbon steel, mild steel, galvanized steel, aluminum alloy, brass, copper, etc.

Q4. What finishes can you provide?
A: powder coating, polishing, zinc/nickel /chrome plating, painting, anodized,hot dip galvanized,

sandblasted, etc.

Q5. How do you ensure quality control? 
A: First of all, Our company is aiming to avoid any problems before the production. So we will

confirm every detailes before the quotation. Once the order is confirmed, we will also re-confirm

all the detailes with the customer. Only by this way, we can avoid the mistakes and save the cost

for us. 

Secondly,Our company has a strict requirment for our suppliers on the quality control. They must be

performed according to ISO9001:2008 Standard. Such as Initial sample test, last sample test, Random

test, etc.

Q6. Is small quantity available?
A: Yes, Small quantity for trial order is available. 

Q7. How do you ship the goods?
A: We have our cooperation forwarder, they can deliver the goods to you in very short time with

competitive price, and you can ship by your own agent as your convenience.

Q8. How about your delivery time ? 
A: 15 days for samples and 25-50 days for mass production.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier